How To Document A Design Change Without Confusing Your Builder

Design changes are a normal part of construction and engineering projects. A client may change the size of a room, an architect may revise a façade, a structural engineer may alter a beam arrangement, a regulatory requirement may force a modification, or a contractor may identify a construction problem that requires the design to be adjusted. The problem is therefore not necessarily that a design has changed. The problem begins when the change is poorly documented and the people responsible for building from the drawings cannot confidently determine what has changed, why it changed, and which information they should now follow. A small undocumented adjustment can create surprisingly large consequences when it reaches the construction site. A revised door position can affect electrical points, finishes and furniture. A changed wall can affect structural elements and services. A modified ceiling can affect lighting and ventilation. Good revision documentation exists to prevent these rela...

Contact Us

Get In Touch With Eggcellent Design Blog

We love hearing from our readers, clients, and fellow architects, engineers, designers, and construction professionals.

Whether you have a question, a collaboration idea, an architectural or AEC design inquiry, or feedback, we’re here to help.

Ways To Reach Us

1. Email

We respond within 24-48 hours on business days.

2. Contact Form

Send us a message directly: Contact Form

3. Social Media

Follow us for updates:

Business & Advertising Inquiries

Interested in advertising, sponsored content, or product reviews?
Email us at kelechichibuikeama@kimland.name.ng with the subject: "Advertising Inquiry - KIMLAND LIMITED"

Location

Abakaliki, Ebonyi State, Nigeria
Note: This is an online platform. Physical visits are by appointment only.